Federal Contract

Electrical Testing (PRE-SOLICITATION)

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

VETERANS AFFAIRS, DEPARTMENT OF

NAICS Code

238210

Set-Aside

SBA

Department

VETERANS AFFAIRS, DEPARTMENT OF

Solicitation Type

Presolicitation

Solicitation #

36C24627Q0081

PSC Code

J061

Division

246-NETWORK CONTRACTING OFFICE 6 (36C246)

Performance State

VA

Posted

Tue, November 3, 2026

Response Deadline

Tue, November 10, 2026

Description

This Presolicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. The Presolicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-02 published in the Federal register December 22, 2023. This solicitation is for a Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 Million Dollars. The FSC/PSC is J061 (Maintenance, Repair, and Rebuilding of Equipment-Electric Wire and Power Distribution Equipment).

Notice history (6)

  1. Nov 3, 2026PresolicitationDue Nov 10, 2026

    J061--ELECTRICAL TESTING

Show 2 earlier notices
  1. Nov 3, 2026SolicitationDue Nov 5, 2026

    J061--ELECTRICAL TESTING

    3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical

  2. Nov 3, 2026SolicitationDue Nov 10, 2026

    J061--ELECTRICAL TESTING (SOLICITATION)

    3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical

  1. Nov 3, 2026SolicitationDue Nov 10, 2026

    J061--ELECTRICAL TESTING (SOLICITATION)

    3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical

  2. Nov 3, 2026PresolicitationDue Nov 10, 2026Viewing
  3. Nov 3, 2026SolicitationDue Nov 10, 2026

    J061--ELECTRICAL TESTING (SOLICITATION)

    3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical

Similar open contracts