B618 Geotechnical Survey
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Geotechnical survey and report for B618, Fuselage Trainer to understand soils water content, Atterberg limits, chlorine residuals, etc. The Geotechnical survey shall include a minimum of 2 soil bores. A site visit has been scheduled for 08 September 2026 at 1000 Central Standard Time.
Similar open contracts
Geotechnical Drilling and Warehouse Services
Please see attached Sources Sought Notice and Draft PWS. Responses are due no later than 2:00 p.m. CDT on 10 September 2026.
Water Analysis BPA
The contractor shall provide all management, equipment, tools, supplies and labor/manpower and appropriate license(s)/ qualification(s) necessary to provide sample bottles, preservatives, laboratory a…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
Water Analysis BPA
The contractor shall provide all management, equipment, tools, supplies and labor/manpower and appropriate license(s)/ qualification(s) necessary to provide sample bottles, preservatives, laboratory a…