City of Social Circle Little River Water Pollution Control Plant
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Time allotted for construction 270 consecutive calendar days. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances. Time allotted for construction is 480 consecutive calendar days and 540 days for final completion.
Similar open contracts
Western Corridor Sanitary Sewer Improvements
Major elements of work include, but are not limited to: construction of gravity sanitary sewer and sanitary sewer force mains; manholes, valves, and trenchless crossings; grading and site work; access…
Clarksville Water Treatment Plant Expansion
The Project includes the following Work:1. Upgrade to the existing Town of Clarksville Water Treatment Plant to expand capacity from 1MGD to 2 MGD.2. Replacement of existing Raw Water Pumps and associ…
66325- Buford Southside WPCP Secondary Clarifier
The Work includes installation of an 80-foot wide by 14-foot-tall circular concrete secondary clarifier at the Southside Water Pollution Control Plant. Associated work includes site grading electrical…
Regional Water Recycling Plant No. 5 (RP-5) Offsite Facilities Project
This project consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fu…
JCSD Intervalley Pipeline Project
The projects consist of demolition, furnishing, installing, testing and making operational 3.3 miles of 42- inch cement mortar lined and coated steel potable water transmission pipeline and associated…
Airport Road Wastewater Improvements (61WW2101C)
The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place the A…