B836 Replace Electrical in Airfield Lighting Vault
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Notice 0001: The description below was edited to correctly reflect this requirement. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of the components listed in the Airfield Lighting Vault. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 18 Aug 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 05 Aug 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 05 Aug 2026, you will not be able to attend the site visit. Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID." Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance. IMPORTANT: All contractors should arrive at Columbus AFB�s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors� center at 9:00 AM CST Additional Info: All RFIs must be submitt…
Similar open contracts
B836 Replace Electrical in Airfield Lighting Vault
Amendment 0001: The purpose of this amendment is to: 1. Attach "Appendix A - Cost Breakdown" to Section J. 2. All other terms and conditions remain unchanged. Notice 0002: All RFI questions with answe…
B836 Replace Electrical in Airfield Lighting Vault
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associa…
B724 Door Access
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associa…
B724 Door Access
Update 1: The purpose for this update is to attach RFI answers, photos, and drawing to the attachments section. NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR C…
Well 4 PFAS/PFOA Upgrade
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this contract. No award will be made under this solicitation until funds are available. The Government�s obligation under this c…
B1130 Annex HVAC System Repair
Notice to Offerors and Suppliers: Funds are not presently available for this contract. No award will be made under this solicitation until funds are available. The Government?s obligation under this c…