ECEP Cooling Tower Basin Improvements
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of work for ECEP Cooling Tower Basin Improvements includes, but is not limited to: A. Provide and Install sluice gates at (3) existing basin openings in between cooling tower cells 3 and 4 B. Provide and Install a 24" CWR bypass pipe between the north side header to the south side header C. Provide and Install butterfly valves at the connection to the existing north header and at the connection to the existing south header D. Replace the pneumatic actuators with electric actuators on the existing cooling tower inlet valves for Cooling Towers 1,2, and 3 E. Replace the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for Cooling Tower 4 F. Provide and install isolation butterfly valves in the main condenser water header between the takeoffs for CT-1 and CT-2, between the takeoffs for CT-2 and CT-3, and between the takeoffs for CT-3 and CT-4 G. Provide and install solenoid valves at the chemical treatment discharge pipes for each cooling tower basin H. Provide control modifications for operation of the sluice gates, tower isolation valves, header isolation valves, and chemical treatment discharge valves You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. BID LINK HERE: https://vendors.planetbids.com/portal/62171/bo/bo-detail/146496