Shady Pines MHP - Improvements to Water Syatem
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
A. The project proposes the following work to the water system: • Replacement of the existing 40+ years old 6,000 gallon steel pressure storage tank with 2: 4,000 gallon buried fiberglass storage tanks. • Construction of a new 95 GPM dual-alternating self-priming booster pump system to pressurize the mobile home park distribution system. The existing 6,000 gallon steel pressure tank is pressurized by the 30 gpm well pump. • Construction of a 45 ft extension on the 1.5” PVC well supply line with two buried shut-off valves from the existing water building to the new water tanks. • Construction of 30 ft of 3” PVC suction line from the new water tank to the interior booster pump system. B. The project also proposes the following work to the water distribution system as Add/Alt services: • Replacing 1,300 ft of existing 1.5 in and 2 in aged water mains of various types with a 3 in HDPE water main in the southern distribution system. • Construction of a flushing hydrant on the new southern distribution system main to permit uni-directional flushing. • Replacing 525 ft of existing 0.5 in and 3/4 in water services of various types with 3/4 in HDPE water pipe and individual shut-off valves in the southern distribution system. Keywords: Water Treatment
Similar open contracts
GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting…
777 Pump Station Improvement Project
The work covered under this contract includes the installation of a turnkey packaged pump station with valve pit and associated appurtenances. The existing pump station wet well and valve pit will be …
777 Pump Station Improvement Project
The work covered under this contract includes the installation of a turnkey packaged pump station with valve pit and associated appurtenances. The existing pump station wet well and valve pit will be …
GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
On September 1, 2026, amendment 0001 to solicitation 1240LT26Q0107 - GAOA LDV Crystal Lakes Water & Septic Resuscitation at Pikes National Forest has been posted to SAM.gov and accomplished the follow…
Bradford Estates Water Treatment Plant Upgrades
Work under this contract includes modification of an existing water treatment facility with existing resin exchange units to include the installation of cartridge filters; ultraviolet disinfection sys…
Repair Water Tanks 1511 & 1512
This project includes demolition of existing Water Tanks 1511 and 1512 and construction of new Water Tank 1513 and associated piping. It also includes replacement of the two existing duty Pumps #1 and…