Cylinder, Assembly, A
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Synopsis PR: FD2030-25-00800 1. Estimated issue date and estimated closing/response date: Issue: October 5, 2026 Closes: November 4, 2026 2. RFP# SPRTA1-27-R-0001 Request for Proposal 3. Service/Spare/Repair/OH: Spares 4. AMC: 1/C 5. Nomenclature/Noun: Cylinder, Assembly, A 6. NSN: 1650-00-741-3109 7. PN: 3-43260-505 8. History: No recent DLA procurement history 9. Description/Function: Cylinder, Assembly, A. DIMENSIONS, 27.0 INCH (L) BY 10.0 INCH (W) BY 9.3 INCH (H). 11.0 POUNDS (WEIGHT). MATERIAL CONTENT, Metal Alloy. Applies mechanical inputs to the rudder actuator to obtain flight control corrections. APPL. TO T-38. 10. Total Line Item Quantity: 0001AA Bid A (First Article Required) 2 each Cylinder, Assembly, A (FA) 0001AB Bid A (First Article Required) 1 lot FA Test Report 0001AC Bid A (First Article Required) 1 lot Certification of Material 0001AD Bid A (First Article Required) 1 lot Certificate of Compliance 0001AE Bid A (First Article Required) 6-38; 23 each Cylinder, Assembly, A (Production) 0002 Bid B (If First Article Waived) 6-38; 25 each Cylinder, Assembly, A (Production, No FA) 11. Application (Engine or Aircraft): T-38 12. Destination: SW3210, Hill AFB, UT 13. Required Delivery: On or Before 31 December 2027 14. Qualification Requirements: Contractor must be an approved source. 15. Export Control Requirements: Yes 16. UID: UID requirements will apply. 17. Qualified Sources: Northrop Grumman Systems Corporation (CAGE 76823) Thomas Instrument (CAGE 5H860) 18. Set-aside: This acquisition will not be set aside. 19. Surplus: Surplus is not authorized. 20. Mandatory Language: The Government does not own the data or the rights to the data needed to manufacture this item. Firms interested in participating in this procurement are encouraged to contact the OEM to inquire about the data or rights to the data. In accordance with FAR 5.207(c) (16) (i), all responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Foreign…