Primary Runway and Pavement Repairs Located at Joint Reserve Base New Orleans, Louisiana.
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
PRE-SOLICITATION SYNOPSIS NOTICE ONLY: THE SOLICITATION WILL BE AVAILABLE ON OR ABOUT NOVEMBER 4, 2026 AT HTTPS://SAM.GOV/. THE SOLICITATION NUMBER IS N6945027R0007, FOR THE DESIGN-BID-BUILD (DBB) CONSTRUCTION PROJECT FOR THE NOLA PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT NAVAL AIR STATION (NAS) JOINT RESERVE BASE (JRB), NEW ORLEANS, LOUISISANA PROJECT TITLE: DESIGN BID BUILD CONSTRUCTION PROJECT, NOLA PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT NAVAL AIR STATION (NAS) JOINT RESERVE BASE (JRB), NEW ORLEANS, LOUISIANA PSC: Z2BD (Repair or Alteration of AIRPORT RUNWAYS AND TAXIWAYS) NAICS: 236220 � Commercial and Institutional Building Construction THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Description: This acquisition may result in the award of a Design Bid Build (DBB) Firm Fixed Price (FFP) Construction contract for the full-depth reconstruction of pavement sections within the Runway 22 threshold, Runway 0422, Taxiway Alpha, Taxiway Bravo, and Taxiway Foxtrot. Asphalt pavement mill and overlay and asphalt section full-depth construction is required to accommodate the new concrete pavement. Additionally, the entire length of runway 0422 is required to be re-striped, following rubber and paint removal. The contract performance period is 1,110 calendar days (inclusive of the base period and any exercised options) from the date of contract award. Schedule submission and prog…