New AC Units for DAFT Building and Secondary Building at WRF
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrical for the units and thermostats, and install new 1-ton rooftop air-conditioning units at each building (Daft and Secondary Buildings) using the existing roof openings where applicable. Contractor shall complete all work as outlined within this Invitation for Bid. Submitted prices must include furnishing of all labor, materials, and equipment for the supply, delivery, installation, manufacture, testing, warranty, and other materials and services required for the work of this project. Workmanship and material to be first quality throughout; in the absence of comment on particular points, industry standard practice should be presumed to prevail. All standard factory equipment shall be included; no deletions of standard factory equipment will be permitted unless specifically superseded in these specifications. Accessories not specifically mentioned herein, but necessary to furnish complete units ready for use, shall also be included.