Rotary Electromechanical Actuator
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The purpose of this amendment is to update the solicitation terms, provisions, and clauses to incorporate mandatory requirements resulting from the Revolutionary FAR Overhaul (RFO) Part 40, DFARS Part 240 (Class Deviation 2026-O0025), and Executive Order 14398. Synopsis PR: FD2030-25-00959 1. Estimated issue date and estimated closing/response date: Issue: Oct 17, 2025 Closes: Nov 17, 2025 2. RFP: SPRTA1-26-R-0017 3. Service/Spare/Repair/OH: Spares 4. AMC: 4/R 5. Nomenclature/Noun: Rotary Electro-mechanical Actuator 6. NSN: 4810-01-132-5907 7. PN: 156130-14 8. History: 15 Mar 2017, 1 each, The Boeing Company (79318) 9. Description/Function: Controls Fuel Flow. DIMENTIONS, 4.0 INCH LONG BY 2.5 INCH WIDE BY 4.0 INCH TALL. WEIGHT: 1.5 LBS: MATERIAL CONTENT, Aluminum Alloy 10. Total Line-Item Quantity: L/I 0001 � 43 Each (Range: 11 EACH - 65 EACH) 11. Application (Engine or Aircraft): F-16 12. Destination: L/I 0001 Ship to SW3211 13. Required Delivery: L/I 0001 Ship To SW3211, On or Before 19 Aug 2026 14. Qualification Requirements: Do not exist 15. Export Control Requirements: No 16. UID: Note to Contractor: UID requirements will apply 17. Qualified Sources: Meggitt North Hollywood Inc. (CAGE 79318) 18. Set-aside: This acquisition will not be set aside 19. Mandatory Language: The Government does not own the data or the rights to the data needed to manufacture this item. Firms interested in participating in this procurement are encouraged to contact the OEM to inquire about the data or rights to the data. In accordance with FAR 5.207(c)(16)(i), all responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Foreign owned firms are advised to contact the contracting officer or program manager before submitting a proposal to determine whether there are restrictions on receiving an award. It is suggested that small business firms or others interested in subcontracting opportunities in connection with the procurement described make …