Municipal Separate Storm Sewer System (MS4) 3-Acre Adoption
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Vermont Department of Environmental Conservation is seeking applications from eligible Municipal Separate Storm Sewer System (MS4) communities who have assumed or will assume responsibility for local three-acre sites and integrate(d) the three-acre sites into their MS4 permit. MS4 adoption of three-acre sites will provide financial and technical assistance to three-acre sites. This grant program aims to support MS4s with developing and implementing stormwater treatment practices to comply with MS4 permit obligations. Available dollars may be used on the three-acre site itself, or for other project(s) identified in an MS4’s Phosphorus Control Plans or Flow Restoration Plans. Grantees will be responsible for 20% of the total project cost.
Similar open contracts
Stormwater Management Services
The purpose of this Request for Proposals (RFP) is to solicit proposals from qualified licensed sources for Stormwater Management Program Services, through professional services competitive negotiatio…
City Stormwater Asset Assessment
2026 Reduce Reuse Pilot Grants
The Reduce Reuse Pilot Grants are awarded by the Solid Waste Program of the Vermont Department of Environmental Conservation to meet the goals of the 2023 Vermont Materials Management Plan. According …
Town of Stanley - Pond Avenue VDH SWAP Sewer Project
This project involves complete abandonment of the existing residential septic system located at 314 Pond Ave and installing new sewer grinder pump station, new sewer force main, house lateral connecti…
Stormwater System Repair
The Town of Hardwick is seeking bids from qualified contractors to repair flood damage to the North Main Street Stormwater System at 64 North Main Street. The system was constructed in 2022 and damage…
Engineering Services – Preliminary Design & Feasibility for Removal of Three Low-Head Dams, Castleton River
PMNRCD is seeking qualified engineering consultants to complete a preliminary engineering design and feasibility assessment for the potential removal of three low-head dams on the Castleton River in F…