PROPOSED IMPROVEMENTS TO SERVE KENNEDY PLACE RURAL WORKFORCE HOUSING INITIATIVE
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the Proposed Improvements to serve Kennedy Place Rural Workforce Housing Initiative as shown on the construction drawings. In general, construction consists of the installation of low pressure force main system consisting of ± 2,614 linear feet of 2" HDPE Force Main, ± 995 linear feet of 3" HDPE Force Main, ± 3,659 linear feet of 4" HDPE Force Main, ± 0.9 miles of urban roadway including grading, drainage, base and pavement, concrete sidewalk, fire lane , curb and gutter; ± 3,024 linear feet of storm drain pipe of various sizes; ± 369 liner feet of 6-inch PVC water main; ± 4,967 linear feet of 8-inch PVC water main, including associated gate valves, fittings, ± 70 residential water meters and services lines, fire hydrants; ± 160 linear feet of 16-inch casing, jack and bore under US Highway 84; ± 8,448 linear feet of 2-inch HDPE natural gas main, erosion and sediment control measures and all associated measures to complete the project according to the plans and specifications. Time allotted for completion of work is 270 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 300 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract