J--HAULOUT OF THE R/V STURGEON
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Amendment 0001 provides responses to questions received and includes Attachment 7 Dimensions of Hydrophones NC 1-08 Shielded 4 Post, Attachment 8 W.W Williams Proposal RV Sturgeon Engine and Gear Refresh and Attachment 9 Centek Marine Quote 20734 1. Drawing 26-105-921 HYDROPHONE INSTALLATION states on GENERAL NOTES states "9. MARPORT HYDROPHONES OUTBOARD MOUNTING ANGLE RESEARVED". Please verify who and when that information will be provided to Contractor. Answer: Marport is the company that makes the science equipment. Two hydrophones spaced approximately 3m apart (+/- 1.5m from centerline) along the stern, both oriented vertically and toed outboard 15 degrees. One, preferably port, tilted down 15 degrees, and the other down 25 degrees. See Attachment 7 Dimensions of Hydrophone NC 1-08 Shielded 4 Post. 2. Please 7.3 Remove Propulsion Shafts and Inspect states "All line shaft bearings and shaft seals shall be replaced when clearances fall outside of the acceptable range." Please verify that the cost associated for any replacement bearings or seals, if necessary, will be part of a Condition Found Report and will be included in a Modification. Answer: Correct. Any conditions identified during the removal and inspection of the bearings and seals will need to be documented by the contractor in a Condition Found Report (CFR) and upon receipt, the Government will review the CFR, and if additional work is approved, the cost will be incorporated into a contract modification prior to the contractor performing the replacement.
Similar open contracts
J--HAULOUT OF THE R/V STURGEON
Amendment 0002 provides response to question received. 1. Could you please provide the Marport Hydrophone Installation Manual referenced in section 8.6? Answer: See Attachment 10 Hydrophone_Installati…
J--HAULOUT OF THE R/V STURGEON
Amendment 0003 provides response to question received via email. See Attachment 12 Questions and Answers for Haulout of Sturgeon.
HAULOUT OF THE R/V STURGEON
COMBINED SYNOPSIS/SOLICITATION NOTICE General Information: Solicitation Number: 140G0226R0020 Issued as: Request for Proposal (RFP) Description of Requirement This is a combined synopsis/solicitation …
Repair of Motor-Pump, HYD
A00001 - A00001 Revised - Attachment 3 - Terms and Conditions have been posted to correct the Navy Repair Manual listed in the originally posted Attachment 3 - Terms and Conditions. Attachment 2 - Sta…
Bravo Dive Boat 65DS1101
AMENDMENT 0005 POSTED 12/5. RFC #16 Response available in Attachments. AMENDMENT 0004 POSTED 12/3. AMENDMENT 0003 POSTED 11/26. AMENDMENT 0002 POSTED 11/21. AMENDMENT 0001 POSTED 11/19. The Regional M…
Bravo Dive Boat 65DS1101
AMENDMENT 0005 POSTED 12/5. RFC #16 Response available in Attachments. AMENDMENT 0004 POSTED 12/3. AMENDMENT 0003 POSTED 11/26. AMENDMENT 0002 POSTED 11/21. AMENDMENT 0001 POSTED 11/19. The Regional M…