Correct Electrical Deficiencies
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
SOW 565-22-500 Correct Electrical Deficiencies Fayetteville VAMC Intent The project consists of correcting electrical deficiencies as noted from previous VA facility assessments. Improvements include; New electrical entrance building, medium voltage loop replacement, replace electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup throughout the Fayetteville VAMC, and minor HVAC and Plumbing improvements. Period of performance 1,174 calendar days. Medium Voltage VA owned medium voltage loop and entrance equipment will be modified or replaced with the following scope: Replace existing medium voltage entrance equipment with new at campus entrance. Provide new building: Slab on grade, brick on CMU wall, Slate roof tile (to match existing facility) Provide new VA owned medium voltage cables in concrete encased duct bank for medium voltage loop. Approximately 300 . Demo and remove old VA owned medium voltage entrance metal shack. Replace medium voltage sectionalized switch. Provide new metal-clad switchgear with draw-out vacuum circuit breakers. Replace medium voltage oil filled transformer (1) Panel Replacement and Branch Circuit Improvements Correct deficiencies to electrical panels and branch circuit wiring which are not correctly sized, protected, or are at end of useful life, as identified through various inspections over the years. o All work will be phased. All replacements to existing equipment will require the contractor to filled-out a phasing plan for VA approval. All replacements to existing equipment will require a temporary power solution to minimize electrical outage to existing areas. Such deficiencies include: Replace-in-same-room building entrance and large distribution equipment: Normal (service entrance) Switchboards: approx. 2 Generator switchboards: approx. 2 Automatic transfer switch: approx. 7 Replace-in-place distribution panels and panelboards distribution equipment Distribution Panels: approx. 5 P…
Notice history (3)
- Nov 4, 2026SolicitationDue Dec 8, 2026
- Nov 5, 2026SolicitationDue Dec 8, 2026Viewing