The Project consists generally of the following major items: Base Bid - Structures #102 and #103 consists of replacing the existing timber decking with Fiber-Reinforced Polymer (FRP) decking. Alternate 1 - Structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures. Alternate 2 - Structure #17 consists of replacing the existing timber structure with Timber Glu-lams and timber decking. Alternate 3 - Structure #17 consists of replacing the existing timber structure with steel framing and Fiber-Reinforced Polymer (FRP) decking.
Similar open contracts
Barnet WCRL(26) & (27)
REMOVAL OF EXISTING STEEL BEAM SUPERSTRUCTURE. INSTALLATION OF NEW PRECAST CONCRETE BRIDGE SEAT AND NEW OPEN DECK SUPERSTRUCTURE.
Method Community Park Improvements Project - Rebid
Exterior restoration of building envelope. New accessible front Pioneers Building entry preserves existing historic stoop. Updates to building systems to support new and existing primary function of p…
FS 31 Interim Decommissioning
Project Description: The project consist of demolition of temporary site and building improvements associated with an interim fire station and restoration of the site to its previous use as a fenced g…
PDSFM - Paving and Facilities Upgrades **RE-BID**
1.) Re-surfacing of existing asphalt driveway/parking, Repairs to existing asphalt driveway/parking, Installation of new asphalt driveway/parking, and new concrete sidewalk; 2.) Red Barn - Interior up…
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specif…
Runway 19L, 28L & 28R Timber Trestle Improvements CA
The Runway 19L, 28L, and 28R Timber Trestles Improvement Project (Project) will implement safety improvements on the trestles serving Runways 19L, 28L, and 28R. These trestles support Federal Aviation…