B027-28 Evansville Water Treatment Plant Improvements
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant . Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of 0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters. The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure. By transitioning to VFD technology, the City aims to: Reduce Energy Costs: Eliminate throttling losses by matching pump speed directly to system demand. Enhance Operational Control: Improve flow flexibility, clearwell level management, and overall system resilience. Minimize Downtime: Mitigate mechanical stress on the pumping infrastructure, virtually eliminating downtime caused by mechanical failure.