Turnkey Eaton UPS Replacement & Installation
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The 119th Wing (NDANG) in Fargo, ND is conducting market research under FAR Part 10 and FAR Part 12 to identify capable commercial sources (both Small and Large businesses) for a complete turnkey UPS replacement. The purpose of this notice is to determine overall market capability and to identify potential Small Business sources (including 8(a), HUBZone, SDVOSB, and WOSB) for acquisition planning purposes. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information. All interested parties are encouraged to respond. The contractor shall provide all equipment, labor, and licensed electrical services to: Deliver and install a new scalable UPS system in Building 542. Complete startup and connected-load testing. Disconnect, remove, and haul away/recycle the existing Eaton 9155 UPS and two external battery cabinets off-site. Brand Name or Equal Equipment: (1 EA) Eaton 9PXM UPS Frame (9PXM08AAXXX) (2 EA) Eaton 4 kVA Split-Phase Power Module (9PXMSPPM) (6 EA) Eaton Battery Pack (9PXMBAT) (1 EA) Eaton 3U Hardwired Bypass Module (BPM125HW) (1 EA) Gigabit Network Card (NETWORK-M3) (1 EA) 3-Yr Onsite 7x24 Next Day Warranty (WFLN73XX-11000UC) (1 JB) Turnkey Delivery, Installation, Startup, and Disposal Key Technical & Site Specs: Power: 208V Single-Phase / Split-Phase (existing 100A breaker is compatible as-is). Footprint: Max 40" L x 24" W (single rack/tower, hot-swappable batteries, min 20 min runtime @ 1.7 kW load). Site Access: Ground-level entrance, parking within 10 ft of door, 2 exterior steps, under 20 ft total carry distance. Please email a reply (email body or attachment) with the following 4 items: Company & Size Info: Company Name, CAGE Code, UEI, POC, and Business Size (Small or Large Business) under NAICS 238210/335999 (including any socioeconomic categories: 8(a), HUBZone, SDVOSB, WOSB). Electrical Capability: Confirm you have licensed electrical support (ND license or recip…
Similar open contracts
Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS Battery Replacement
Offers are due 8 SEPT. The U.S. Army Corps of Engineers Headquarters has a requirement to to execute the full start-up and commissioning of existing data center environmental control systems based on …
FTG247 Replace UPS at IDT1, Fort Greely, Alaska
Presolicitation Notice TITLE: FTG247 Replace UPS at IDT1, Fort Greely, Alaska Identify set aside type PSC Code: Y1BF � Construction of Missile System Facilities NAICS Code: 237130 � Power and Communic…
Long-Duration Energy Storage (LDES) Battery System
INTRODUCTION Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking information from organizations that can provide long-duration energy storage (LDES) battery systems for b…
J061--SOURCES SOUGHT NOTICE - RENTAL OF UPS - Uninterruptible Power Supply FOR PHONE ROOM LOUIS A JOHNSON VA MEDICAL CENTER 36C24526Q0812
Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this Notice of Sources Sought for a contractor for delivery, installation, and start-up, of a r…
J061--SOURCES SOUGHT NOTICE - RENTAL OF UPS - Uninterruptible Power Supply FOR PHONE ROOM LOUIS A JOHNSON VA MEDICAL CENTER 36C24526Q0812
Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this Notice of Sources Sought for a contractor for delivery, installation, and start-up, of a r…
NC Department of Information Technology
NCDIT Eastern Data Center – UPS Battery Replacement-The scope of this project will include the replacement of (3) UPS battery strings supporting 825kVA UPS.