Solicitation - Replacement of Chillers, Bldg. 8280, Baumholder, Germany
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
***Amendment 01 of this solicitation posted on 3 September 2026*** The purpose of this amendment is to update and simplify the submission requirements for Evaluation Factor #3 and to extend the due date of Step 1 Technical Proposals. Step 1 Technical Proposals are due Thursday, 10 September 2026 at 1500hrs CEST. For details see new attachment - AMENDMENT 01_ Solicitation Handout_GDP-B0683-6P Replace Chiller #8280_3SEPT26 The U.S. Army, 409th Contracting Support Brigade (409th CSB), Unit 23163, APO AE 09227, intends to award a Firm Fixed Price, single award contract for the Replacement of Chillers, Training Center Building #8280 located in Baumholder Smith Barracks, Baumholder, Germany. This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in RFO Part 14.211. This posting initiates Step One, which is a request for technical proposals only. Offerors determined to be acceptable in Step One will be notified of Step Two via receipt of the Invitation for Bid (IFB) solicitation document. SEE ATTACHMENTS FOR MORE DETAILS.
Similar open contracts
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…
B35 Chiller Replacement
Update: 8/27/2026 - Included RFis, corrected information on site Visit slides, Updated Wage determination, and extended solicitation close to 11 September 2026 Update: 8/21/2026: Included Site visit s…
B35 Chiller Replacement
Update: 8/27/2026 - Included RFis, corrected information on site Visit slides, Updated Wage determination, and extended solicitation close to 11 September 2026 Update: 8/21/2026: Included Site visit s…
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0005 WAS POSTED ON 03 SEPTEMBER 2026 AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026 AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026 The Site Visit Roster was posted on 17 August 2026 AMENDMNENT 000…