Cherry Street Sewer Upgrade
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The new sewer line is proposed divert flow around the cell tower and its footprint. There will be an additional two (2) new manholes. The project will also replace one (1) existing manhole, and approximately 82 linear feet of existing sewer piping. All new pipe will match the existing piping and will be 8” DIP. The project will utilize 60 linear feet of existing 14” casing to install the new 8” piping at the existing railroad tracks.