Sand Trail Phase II
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ26Q0021 is issued as a Request for Quotation (RFQ). This project is located on the Cordova Ranger District. This contract aims to repair and mitigate future failures of the USFS Sand Trail infrastructure, trail number 229. The total trail length is 12.20 miles long; this contract will only address the first 1.70 miles of failing trail. The mitigation consists of installing bank armoring with rip rap, and placing sub grade aggregate along the trail. The sub grade aggregate (3� minus) is to be placed as backfill behind the riprap and is incidental to item 201501A. Backfill quantities will vary but the end product is to have ~2-4 ft of 3� minus behind the placed riprap. The D-1 aggregate is to be placed on the trail running surface to harden the trail for ATV use. The majority of trail 229 is 6 to 8 feet in width and will require additional clearing and minor excavation depending on type of equipment used. Construction must occur during low water times of year, diversion of smaller channels within the project location will be needed to dewater bank locations. Small diversion for bank armoring is assumed to be conducted with either a dozer or excavator that may operate in the stream channel or along the stream bank. Work must be performed when there is 5 consecutive days below 30F degrees are reached This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Similar open contracts
Sand Trail Phase II
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested…
Multiple Trail Bridges Replacement Project Phase 2
August 14, 2026 Amendment 1 is now posted in the Attachments section of this posting. The purpose of this amendment is to: Post the answers to the questions that were submitted by the due date stated …
Multiple Trail Bridges Replacement Project Phase 2
September 2, 2026 Can previously submitted PPQs be submitted in lieu of obtaining new PPQs? No, previously submitted PPQs cannot be submitted in lieu of obtaining new PPQs On page 3 of the SF1442, the…
GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. Solicitation number 127EAX26Q0070 is issued as a Request for Quotation (RFQ) for GA…
Gunnison Ranger District Soap Creek Stream Repairs
Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are bei…
Superior NF FR377 Tomahawk Road Repairs
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested…