56--Heater Replacement, Building 80
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The intent of this project is to replace outdated heating system in Building 80. The work includes, but is not limited to, replacing old piping and unit heaters within the building with new appropriately sized piping and unit heaters, and provide new or replace existing fin tube radiation (FTR) in various office spaces. The work will include wiring and circuit breaker installation to replace dated system. All work will be completed in accordance with scope of work. This project is listed as a design build and solicitation will include drawings, bid break down form, and Div 1 specifications.
Similar open contracts
HVAC Upgrades - DPW Garage
Remove existing steam boiler and associated heating system. Install new gas-fired rooftop makeup air units and associated gas piping. Install new infrared heating units and associated gas piping. New …
HVAC Upgrades - DPW Garage
Remove existing steam boiler and associated heating system. Install new gas-fired rooftop makeup air units and associated gas piping. Install new infrared heating units and associated gas piping. New …
HVAC Upgrades - DPW Garage
Remove existing steam boiler and associated heating system. Install new gas-fired rooftop makeup air units and associated gas piping. Install new infrared heating units and associated gas piping. New …
Z--RM12-2050, Repair and Renovate UPH-BEQ Building 3606, JEB Little Creek-Fort Story, Virginia Beach, VA.
This is neither a request for quote or proposal nor an invitation for bid. The intent of this pre-solicitation synopsis is to inform potential offerors of this requirement. The Request for Proposal (R…
Z--RM12-2050, Repair and Renovate UPH-BEQ Building 3606, JEB Little Creek-Fort Story, Virginia Beach, VA
This is neither a request for quote or proposal nor an invitation for bid. The intent of this pre-solicitation synopsis is to inform potential offerors of this requirement. The Request for Proposal (R…
Building 164 HVAC Repair
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case…