Fermilab- CUB Boiler 1 PC Replacement-382968-DG
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Subcontractor shall perform all work as described in the Statement of Work titled the, �CUB Boiler 1 PLC Replacement� All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.