Clean Power Pasadena Partnership
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The City of Pasadena (“Pasadena”) through its Department of Water and Power (“PWP”) is issuing a Request for Proposals (“RFP”) for one or more distributed generation renewable energy facilities (“Proposed Project”). Proposed Projects must be located within PWP service territory and must interconnect directly to PWP's electric distribution grid. PWP is seeking distributed resources larger than 200kW. In 2023, the Pasadena City Council adopted Resolution No. 9977, declaring a climate emergency and committing to source 100% of the city’s electricity from carbon-free resources by the end of 2030. This bold initiative positions Pasadena as a leader in climate action, surpassing state mandates and most voluntary targets set by other utilities and corporations. To meet the Resolution No. 9977 goal and to fulfill energy procurement requirements of 100% carbon-free supply, Proposed Projects must meet the requirements of the California Renewable Energy Resources Program (Public Utilities Code, or PUC §§ 25740 et seq.) and the California Renewables Portfolio Standard Program (PUC §§ 399.11 et seq.). This RFP supports both Pasadena’s 100% carbon-free goal under Resolution No. 9977 and PWP’s compliance with California’s Renewables Portfolio Standard (“CA RPS”) as outlined in PUC § 399.30. PWP is primarily seeking Projects with commercial operation or delivery start dates on or before December 31, 2028, with a minimum delivery term of 10 years. PWP will consider Proposals with delivery start dates later than December 31, 2028, or with alternative delivery terms.
Similar open contracts
Design-Build Services for Solar and Energy Storage Installations at Category 1 City-Owned Properties
The City of Pasadena (“City”), through Pasadena Water and Power (“PWP”), is issuing this Request for Proposals (“RFP”) to solicit proposals from qualified firms to provide Design-Build services by a D…
Low-Interest Solar and Energy Storage Loan Program
The City of Pasadena, through Pasadena Water and Power ("PWP"), is seeking proposals from qualified local banks and credit unions to partner in implementing a Low-Interest Solar and Energy Storage Loa…
Mobile Substation Project
The City of Pasadena is seeking proposals from qualified manufacturers to provide two mobile substations for Pasadena Water and Power. This project is needed to provide emergency power and support con…
Fair Oaks Substation Professional Design Services
The City of Pasadena is seeking proposals from qualified firms to provide engineering services for the Fair Oaks Substation Project. The project is needed to address equipment obsolescence as well as …
Purchase and Installation of Variable Frequency Drive for Selective Catalyst Reduction Tempering Air Fan
The City of Pasadena, Water & Power Department is soliciting bids from qualified vendors to provide and install a variable frequency drive at the City’s Power Plant located at 85 East State Street in …
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
The City of Pasadena Water and Power Department (“PWP”) is seeking proposals from qualified and experienced firms to provide wood pole inspection, repair, restoration, treatment, and related reporting…