Baku Office Building Chancery Roof Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
***Amendment 05 - Proves responses on document Q&A 2 for questions received*** ***Amendment 04 - Extends the proposal due date to September 9, 2026 by 3pm ET.*** ***Amendment 03 - Provide responses to questions received*** ***Amendment 02 - Add Attachment 7 - Authorized Baku Hotels and Rates for 2026 and Attachment 8 - TDY Briefing. The offeror is required to review Attachment 8, sign page 7, and bring the signed form to the site visit*** ***Amendment 01 - Correct the reference in L-003, Factor 1 from Design/Build to Design-Bid-Build*** This is the formal Request for Proposal (19AQMM26R0293) for the OBC Roof Replacement at the US Embassy in Baku, Azerbaijan. The pre-proposal site visit is scheduled for August 5-7. Questions are due no later than August 14, 2026 by Close of Business. *Potential offerors are required to attend the pre-proposal site visit in order for their proposals to be considered for award.* See the Attachments/Links tab for the RFP and associated documents. *The drawings are a controlled item and a verification of the requestor's profile will be verified before approving the request to access the drawings.*
Similar open contracts
Baku Office Building Chancery Roof Replacement
Amendment 06 - Revise M-003 Amendment 05 - Proves responses on document Q&A 2 for questions received Amendment 04 - Extends the proposal due date to September 9, 2026 by 3pm ET. Amendment 03 - Provide…
Baku Office Building Chancery Roof Replacement
Amendment 04 - Extends the proposal due date to September 9, 2026 by 3pm ET. Amendment 03 - Provide responses to questions received Amendment 02 - Add Attachment 7 - Authorized Baku Hotels and Rates f…
Baku Office Building Chancery Roof Replacement
Amendment 07 - Correct the formulas for lodging and M&IE in Attachment 4 - Price Sheet Amendment 06 - Revise M-003 Amendment 05 - Proves responses on document Q&A 2 for questions received Amendment 04…
Freetown NOB, Rec Center, and CAC Roof Replacement
Amendment 05 - Correct the formulas for lodging and M&IE in Attachment 4 - Price Sheet Amendment 04 - Revise M-003 Amendment 03 - Extend the proposal due date, post answer to questions received, issue…
Freetown NOB, Rec Center, and CAC Roof Replacement
Amendment 03 - Extend the proposal due date, post answer to questions received, issue Revised 01 - Attachment 1 - Freetown Specifications. Amendment 02 - Add Attachment 8 - Pre-bid Site Visit Photos A…
Freetown NOB, Rec Center, and CAC Roof Replacement
Amendment 04 - Revise M-003 Amendment 03 - Extend the proposal due date, post answer to questions received, issue Revised 01 - Attachment 1 - Freetown Specifications. Amendment 02 - Add Attachment 8 -…