NTX Steam Trap Monitoring
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Contractor shall provide all labor, supervision, management, materials, equipment, tools, transportation, permits, and incidentals necessary to: Survey, tag, and baseline the entire steam trap population; Replace one hundred percent (100%) of the verified trap population with quick-change trap-station assemblies; Furnish, install, commission, monitor, and maintain a continuous wireless steam trap failure monitoring system covering 100% of the replaced traps; Perform semiannual preventive maintenance (PM) and testing of all trap stations; and Perform repair and replacement of steam traps and associated steam distribution components IAW PWS.