Maintenance, Repair, and Preservation of YT-812
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Regional Maintenance Center at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) is conducting market research to determine industry capability and interest in performing the maintenance, repair, and preservation of YT-812. Work will be accomplished at the Contractor's facility. The Government is seeking responses from sources that can perform the following work. Geographical Area of consideration: To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. YT-812 � Length: 90 FT � Width: 38 FT � Age: 4 YRS � Hull Type: Steel � Draft: 16 FT � Full Displacement: 494 L Tons � Light Load: 438 L Tons Scope Overview: Coordinate with the Contracting Officer, via the SUPERVISOR to deliver the vessel to the Contractor�s facility. The Government will transport the vessel to the Contractor�s repair facility. Upon docking vessel, wash, and clean vessel. Replace zinc and impressed anodes. Blast and preserve underwater hull and freeboard, bulwarks, and handrails. Blast and preserve main deck, 1st deck, and 2nd deck non-skid. Perform hull and freeboard Ultrasonic Test (UT) inspections. Perform hull and freeboard, main deck, 1st deck, and 2nd deck Visual Inspections (VT). Repair hull and winch valves. Repair deckhouse expansion joint. Open, pump, clean, inspect and test CHT, ballast, potable water, fuel oil, waste oil and day tanks. Preserve, disinfect and certify the potable water tank. Onload fuel. Repair HVAC thermostat. Replace deck winch, mast, and brow systems hydraulic hoses. Accomplish 1- and 5-year interval inspection and repair requirements for port and starboard Schottel Z-drive units. Accomplish repairs to the port and starboard twin disc transmission coolers. Accomplish winch control piping modification (YT808-0104D), air piping…