KC-135 Center Console Refresh (CCR) Revision 2
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
26 May 26 Removed previous SRD and added a copy without password requirement 21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government Removed and replaced the KC-135 CCR Baseline Configuration pdf. 05 May 26 Added KC-135 CCR Baseline Configuration to Bidder's Library Added TO 00-5-16 to Bidder's Library Added In Person Industry Day Measurements for KC-135 CCR Memo 28 Apr 26 Added In Person Industry Day Pictures KC-135 CCR Memo 23 April 2026 The following documents have been deleted due to non-applicability and/or being outdated. (CUI) AFRL-STO MBSE Style Guide v0.2.pdf OMG SysML Ver 1.7.pdf The following document has been uploaded (U) AFRL MBSE Style Guide v2-1 ------------------------------------------------------------------ 15 April 2026 Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses. ------------------------------------------------------------------ 07 April 2026 NOTICE: AIRCRAFT TOUR ACCESS INFORMATION The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour: � Non?CAC Holders: Please arrive at the Tinker AFB Visitor�s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing. � CAC Holders: Please arrive at the Visitor�s Center at 7:30 a.m. for check?in prior to the tour. Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate. Please plan accordingly to avoid delays. The tour is scheduled to conclude by 4:00 p.m CST ------------------------------------------------------------------ 03 April 2026 The Government is providing the following documents: The Q&As from the questions asked during the Virtual Indust…
Similar open contracts
KC-135 Center Console Refresh (CCR) Revision 2
26 May 26 Removed previous SRD and added a copy without password requirement 21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 Ma…
KC-135 Center Console Refresh (CCR) Revision 2
26 May 26 Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format. 21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Upl…
KC-135 Center Console Refresh (CCR) Revision 2
28 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government 26 May 26 Removed previous SRD and added a copy without password requirement. Upda…
KC-135 Center Console Refresh (CCR) Revision 2
21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and attached the Q&A document with recent questions from Industr…
KC-135 Center Console Refresh (CCR) Revision 2
21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and attached the Q&A document with recent questions from Industr…
KC-135 Center Console Refresh (CCR) Revision 2
24 June 26- Updated and attached the Q&A document with recent questions from Industry and responses from the Government, The few remaining unanswered questions will be uploaded next week. 03 June 26 -…