Requirements Contract to Furnish & Install Polyethylene Water Service Replacements
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of work includes but is not limited to: reactive replacement of existing polyethylene with copper services. The Contract term is for one (1) year, with provisions for two (2) one-year extensions. DOWNLOAD SPECIFICATIONS FOR FULL DETAILS
Similar open contracts
Service Line Replacement
The project consists of, but is not limited to, the following major elements: The City of Manchester has developed a service line inventory as mandated by the Lead and Copper Rule. The City is reques…
Bids for Construction Contract - Lead Service Line Replacement Program
The Lead Service Line Replacement Program will target replacements of lead service lines within multiple areas of the Town of Putnam WPCA service territory. For the purposes of this project, galvanize…
Elloree Waterline Replacement Project
DIV I Base Bid: install approx 3,500 LF of 8” watermain to replace ex. waterlines, replacement of 5 FHs. DIV II – Alt. A - install 2,700 LF 8” to replace ex. waterlines, replacement of 3 FHs. DIV III …
Water Line Replacement at Oakland and Santa Fe - CIP 5661 in CA
The scope of work generally consists of, but is not limited to the installation of approximately 8,200 linear feet of 16-inch C900 PVC water main, including all required fittings, valves, valve boxes,…
ITB No. 26-2965-5EAR - Williamsburg Road and Chapman Lane Water Line Extensions
The Work consists of consists of providing approximately 1,035 linear feet of 16-inch ductile iron, polyethylene wrapped and 700 linear feet of 4-, 6-, 8- and 12-inch ductile iron, polyethylene wrappe…
IFB 161165 Polypropylene HDPP Dual Wall Pipe
Soliciting bids from qualified firms to furnish and deliver Polypropylene Double Walled Pipe on an as needed, as requested basis, which shall include Type S, double wall, corrugated outer and smooth i…