Georgia

West Side Loop Section 3 36-inch Water Main Replacement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Cobb County-Marietta Water Authority

Government Type

county

Solicitation #

PE-66365-NONST-2028-000000039

NIGP Code

91360

Performance State

GA

Posted

Fri, November 20, 2026

Response Deadline

Tue, December 22, 2026

Description

The work described by these specifications is in Southwest Cobb County, Georgia. The purpose of this project is to replace the existing 36-inch prestressed concrete cylinder pipe (PCCP) and some 36-inch ductile iron pipe (DIP) with approximately 37,000 LF of 36-inch zinc-coated, double bonded-joint and double poly-wrapped DIP. The project begins at the intersection of Casteel Road and Friendship Church Road and travels south continuing onto Villa Rica Road, intersecting SR 360/Macland Road and continuing south onto Old Villa Rica Road. The water main then turns east onto Macedonia Road and runs to just before Barrett Parkway with a tie-in to CCMWA¿s existing 36-inch DIP water main.

Similar open contracts