Federal Contract

USACE SPK DBB Construction - LAR C3B South - Sacramento, CA

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE ARMY

NAICS Code

237990

Set-Aside

SBA

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

W9123827BA002

PSC Code

Y1LC

Division

W075 ENDIST SACRAMENTO

Performance State

CA

Posted

Thu, October 1, 2026

Response Deadline

Tue, October 20, 2026

Description

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for design-bid-build (DBB) construction services to conduct erosion control and levee strengthening protections along the South bank of the Lower American River (LAR) in Sacramento, California (CA). The anticipated project is required to continue American River Common Features (ARCF) erosion reduction efforts along the LAR. Prior efforts were awarded under USACE contract W9123824C0014, LAR Contract 3 (C3) A. The anticipated forthcoming requirement is referred to as �LAR C3B� (Contract 3B). The Government anticipates work will be required along the South bank of the American River (Site 4-1) to include constructing launchable rock toe, launchable trench, bank protection, and tie backs along approximately 1.5 miles of river, located on the left (South) bank, which roughly extends from Watt Avenue upstream to near Mayhew Drain. The Government anticipates work will include excavating, placement, and regrading of material on the riverbank slope and levee embankment, installation of soil-filled rock slope protection on the waterside levee face and riverbank, soil and rock placement to construct river toe protection and planting bench features, instream wood structure placement on the planting benches, construction of buried launchable trench features in the overbank, tie-in of erosion protection elements to existing rock revetment features, providing temporary erosion control for stabilization of disturbed soil areas, and import and placement of riprap. The Government anticipates vegetation clearing will be performed under a separate Government contract prior to erosion protection efforts. The Government anticipates the requirement will be fully designed. The Government estimates the anticipated requirement can be constructed within five-hundred-ten (510) calendar days from Contractor receipt of Notice to Proceed. The Government estimates work may be completed i…

Similar open contracts