VETERANS AFFAIRS, DEPARTMENT OF

NAICS Code

236220

Set-Aside

SDVOSBC

Department

VETERANS AFFAIRS, DEPARTMENT OF

Solicitation Type

Solicitation

Solicitation #

36C26127Q00260001

PSC Code

Z2DA

Division

261-NETWORK CONTRACT OFFICE 21 (36C261)

Performance State

CA

Posted

Wed, November 4, 2026

Response Deadline

Fri, November 20, 2026

Extended to Nov 24, 2026 by a later notice

Description

VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks …

Notice history (7)

  1. Oct 14, 2026SolicitationDue Nov 12, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo

Show 3 earlier notices
  1. Nov 4, 2026SolicitationDue Nov 20, 2026Viewing
  2. Nov 13, 2026SolicitationDue Nov 20, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo

  3. Nov 13, 2026SolicitationDue Nov 20, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo

  1. Nov 16, 2026SolicitationDue Nov 20, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo

  2. Nov 17, 2026SolicitationDue Nov 24, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo

  3. Nov 18, 2026SolicitationDue Nov 24, 2026

    VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for dispo