Fort Lee Vehicle Recovery Range
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Similar open contracts
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0005 WAS POSTED ON 03 SEPTEMBER 2026 AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026 AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026 The Site Visit Roster was posted on 17 August 2026 AMENDMNENT 000…
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026 AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026 The Site Visit Roster was posted on 17 August 2026 AMENDMNENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY …
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0005 POSTED ON 03 SEPTEMBER 2026 AMENDMENT 0004 POSTED ON 25 AUGUST 2026 AMENDMENT 0003 POSTED ON 21 AUGUST 2026 AMENDMNENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON FRIDAY, 31 JU…
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0004 POSTED ON 25 AUGUST 2026 AMENDMENT 0003 POSTED ON 21 AUGUST 2026 AMENDMNENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON FRIDAY, 31 JULY 2026 The Response Date Time Zone is East…
Fort Eustis Dredge Material Management Area (FEDMMA)
Amendment 0004: An amendment has been made to Solicitation W9123626BA0008. Please see attachment SF30, Solicitation Amendment W9123626BA008_0004, which incorporates revised Definitive Responsibilty Cr…
Extend Perimeter Fence at Division St. Gate
Update 1 September 2026: Solicitation Amendment 0003 is uploaded. The purpose of Amendment 0003 is to update the primary Contracting Officer. Please submit all correspondence to Alice Townsend-Peden a…