Federal Contract

Maintenance Dredging Schuylkill River Philadelphia, PA

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE ARMY

NAICS Code

237990

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

W912BU-19-B-0004

Division

W2SD ENDIST PHILADELPHIA

Performance State

PA

Posted

Fri, May 3, 2019

Description

The purpose of this amendment is to correct the previous quantities listed. As a result, this pre-solicitation is hereby amended to incorporate the following changes: Estimated quantity for the Base Bid is 393,417 CY, and Option 1 estimated quantity is 471,854 CY. Total Base plus Option estimated quantities are 865,271 CY. May 1, 2019 Contracts Branch (ca) FedBizOps Action Code: Pre-solicitation/Synopsis Class Code: Z Subject: Maintenance Dredging Schuylkill River, Mouth to University Ave, Philadelphia, PA Solicitation Number: W912BU-19-B-0004 Set-Aside Code: Unrestricted Response Date: 17 June 2019 - 11:00 a.m. Eastern Time. Place of Performance: U.S. Army Engineer District, Philadelphia, Wanamaker Building, 100 Penn Square East, Philadelphia, Pennsylvania 19107-3390. Description of Work: The U.S. Army Corps of Engineers, Philadelphia District intends toaward a firm fixed-price that consists of Maintenance Dredging of the Schuylkill River that consists of the following: (a) Dredging of the 33-foot project required within the authorized channel limits to a depth of 33' MLLW (Datum) plus 1' allowable over-depth. The over-depth limited by a vertical plane through the 33' contour. Station 0+600 to 16+980. This requirement includes one (1) option. Estimated quantity for the Base Bid is 393,417 CY and Option 1 estimated quantity is 471,854 CY. Total Base plus Option estimated quantities are 865,271 CY. (b)No side or end slopes will be specified for this contract. (c)Before and after dredging quantities will be computed on the same basis as the foregoing. (d)Dredging work must be accomplished by hydraulic pipeline dredge only. (e)The use of hopper and mechanical/bucket dredges will not be permitted under this contract. (f) The Government-owned Fort Mifflin containment site, area B, will be available for disposal of dredged material by hydraulic dredge. The awarded contract will contain Liquidated Damages at a rate to be specified in the Solicitation. Solicitation No. W912…

Similar open contracts