36C25226Q0689 UPDATED!! J045--ONE TIME BUY - COMP - Fire Pump Packing Repair - One time repair: RESPONSES DUE BY 9/16/26 10:00 AM LOCAL TIME.. 537-26-3-6111-0993
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
FIRE PUMP REPACKING The Jesse Brown VA Medical Center in Chicago, IL, requires a repack on a Peerless 5AEF11G 1000 GPM Fire Pump in the main fire pump room of the Bed Tower as required by local fire codes and regulatory authorities to ensure the fire system functions properly in event of an emergency. Contractor shall supply all labor, tools, materials and travel to and from worksite. Please use the attached SF1449 titled "36C25226Q0689_2 SAM.gov" to submit quotes.
Similar open contracts
J045--ONE TIME BUY - COMP - Fire Pump Packing Repair - One time repair: 9/10/26. 537-26-3-6111-0993
Fire Pump Repacking Services The purpose of this project is to perform a repack on the Peerless 5AEF11G 1000 GPM Fire Pump in the main fire pump room of the Bed Tower as required by local fire codes a…
J045--ONE TIME BUY - COMP - Fire Pump Packing Repair - One time repair: 9/10/26. 537-26-3-6111-0993
Fire Pump Repacking Services The purpose of this project is to perform a repack on the Peerless 5AEF11G 1000 GPM Fire Pump in the main fire pump room of the Bed Tower as required by local fire codes a…
FIRE PUMP REPAIRS
The engine has already been removed. If work can be performed on site, that would be great as I�m sure shipping it to NJ would be cost prohibitive. PART 1 � GENERAL 1.1 SCOPE: The Contractor shall pro…
43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (J…
43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (J…
FIRE PUMP REPAIRS
PART 1 � GENERAL 1.1 SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to rebuild (1) John Deere serial/equip ID # RG6…