Well 10, Well 11 & Well 12 - MCC Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Work included in this Project consists of Demolition of the existing soft starter/MCC section that powers the existing 200 HP Well pump at Well sites 10, 11, and 12 each. Provide new standalone Reduced Voltage Soft Starter (RVSS) for existing 200 HP well pump at Well site, 10, 11, and 12 each as indicated on Drawings. Provide required cable and conduit to complete the installation of the new soft starter, and commissioning of the Work. . The City is issuing this IFB to secure a qualified Specialty Contractor C-11 Licensed Contractor to perform the Work and provide Materials as more particularly described in the Specifications attached to this IFB, and incorporated herein by reference. Bidders must submit Bids encompassing the entire Project, inclusive of the related Plans, Specifications, related construction drawings and Reference Documents. Failure to do so may result in a determination that the Bid is non-responsive.