Federal Contract

Remedial Action (RA) activities at the Kahuku Point Former Radio Range site

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

FEDERAL AVIATION ADMINISTRATION

NAICS Code

562910

Set-Aside

SBA

Department

TRANSPORTATION, DEPARTMENT OF

Solicitation Type

Presolicitation

Solicitation #

697DCK-27-R-00036

PSC Code

F108

Division

697DCK REGIONAL ACQUISITIONS SVCS

Performance State

HI

Posted

Mon, October 26, 2026

Response Deadline

Thu, November 5, 2026

Description

The Federal Aviation Administration (FAA) contemplates issuing a Screening Information Request (SIR) for Remedial Action (RA) activities at the Kahuku Point Former Radio Range site (Site), located on the North Shore of Oahu, Hawaii. Activities include excavating 3,768 tons of soil contaminated with lead and polychlorinated biphenyls (PCBs) and disposing of the soil offsite according to applicable regulations. The purpose of this pre-solicitation is to solicit statements of interest and capabilities from Small Business Administration (SBA) small business concerns capable of performing the type of work described in this notice. The Contractor will provide all equipment, supplies, labor, transportation, and supervision necessary to perform the tasks described in the scope of work (SOW), not attached. The SOW includes, but is not limited to, the following: - The Contractor must excavate contaminated soil that was identified in reports that will be available at time of solicitation. - The Contractor must arrange for proper storage, transport, and disposal of all investigation-derived waste (IDW) generated from this RA, including necessary sampling for proper disposal. Backfilling of the excavated area will not be required. - Excavation, hauling, and disposal, quantities are as follows: Area to be excavated: 3.2 acres. Average depth of excavation: 1 foot. Average density of excavated soil excavation reports at the site): 0.73 tons per cubic yard. Total tons to be excavated: 3,768 tons. - The Contractor must decommission and remove the five (5) groundwater monitoring wells at the Site. The wells must be decommissioned according to the regulatory requirements of HDOH. The wells are very shallow and will not require the use of a drill rig for removal. - The Contractor must identify all buried utility systems where subsurface work will take place. A request for locate services with the appropriate public utility dig-line for the area must be filed within the required timeline…

Similar open contracts