Mdc Brooklyn - Remove and Replace Shower Partitions
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This is a combined synopsis/solicitation for commercial construction for MDC Brooklyn located at 80 29th Street Brooklyn, NY, 11232, and is prepared in accordance with the format in subpart FAR Revision Subpart 12.202(b)(1), as supplemented with additional information included in this notice. This announcement constitutes as the only solicitation; quotes are being requested and a written solicitation is issued (see attached). You are required to provide all pages of the written attached solicitation with your complete quotation. The Federal Bureau of Prisons (BOP) anticipates issuance of solicitation 15BBR027Q00000003 for the award of a firm fixed-price construction contract titled REMOVE AND REPLACE SHOWER PARTITIONS at the Metropolitan Detention Center in Brooklyn, NY. MDC Brooklyn is a federal correctional facility located at 80 29th Street Brooklyn, NY 11232. The contractor is responsible to provide all equipment and labor to remove and replace all existing shower partitions (with attached changing rooms) and bathroom stall partitions on the 2nd, 3rd, 4th, 5th, and 6th floors of the East Building at MDC Brooklyn. Each floor contains a North and South side, and each side includes: 6-bathroom stalls 7- shower stalls with changing rooms Changing rooms shall be 39.5 inches deep and include a door All partitions shall be floor- and overhead braced. Materials and finishes shall include: Powder-coated steel partitions 58-inch doors and panels Chrome zamac hardware Silver Vein color for all doors and panels Contractor shall also remove and replace all affected existing restroom accessories including, but not limited to, handicap grab bars, toilet paper holders, sanitary napkin dispenser, towel bars, soap dispensers, etc. Contractor to provide industrial standard labor and materials warranties from date of substantial completion. See the Statement of Work (SOW) attachment. The performance period for the project will be 60 calendar days from issuance of the notice to proc…