North Carolina

Neuse River Resource Recovery Facility BNR Basins MCC Replacement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

CITY OF RALEIGH

Performance State

NC

Posted

Wed, September 16, 2026

Response Deadline

Wed, October 21, 2026

Description

Neuse River Resource Recovery Facility BNR Basins MCC Replacement: • Demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B. • Demolition and replacement of PLC-81, PLC-82, and PLC-83 cabinets. • New prefabricated metal enclosure with walls, roof, doors, lighting, and HVAC system to house new MCC and PLC. • Extension of existing concrete foundation to accommodate new enclosure footprint. • Demolition and replacement of all power wire cable within existing conduit from each MCC to each motor and device on BNR Aeration Basins 1-6. • Demolition and replacement of sections of corroded electrical conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.

Similar open contracts