North Carolina

Camp Pond Dam Reconstruction Project

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

CITY OF RALEIGH

Performance State

NC

Posted

Tue, September 22, 2026

Response Deadline

Thu, November 5, 2026

Description

The Project consists generally of the following major items: • Removing the corrugated metal pipe portion of existing primary spillway, grout and seal off upstream portion of spillway, and demolish and remove existing riser. • Install cured-in-place pipe for reinforced concrete pipe portion of existing primary spillway for stormwater conveyance from existing catch basins on Richland Drive. • Removing the existing auxiliary weir and replacing with a weir with an overall length of 75 feet. • Construct headwall downstream of the cured-in-place pipe. • Place riprap and grouted riprap to tie in downstream grades and side embankments on downstream slope of Camp Pond Dam towards Richland Creek. • Place quarry stones in Richland Creek.

Similar open contracts