Dorchester School District Two, SC
IFB #2627-008 - Summerville High School Track Resurfacing
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Removal of existing resilient layer at Summerville High School's track facility. Repairs to asphalt base as needed. Installation of full pour polyurethane resilient track system.