ASP Hot Pad #2 Rehab
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
ASP Hot Pad #2: Remove vegetation inside of area as well as around the perimeter. Install new breaker and feed from panel across the street to poles in lot as shown. Remove and install electrical service, LED lights on existing poles with mounts and photocell. Upgrade LPS system to meet current standards. Refresh crusher run stone base, compact and grade lot to drain to stormwater conveyance system. Tighten or replace sections of fence that have loosened or sagging to maintain security within the compound.