INVITATION TO APPLY FOR PRE-QUALIFICATION FOR DEAD RUN AT GEORGETOWN PIKE
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Restoration of 5,916 linear feet of stream using natural channel design and riparian corridor enhancements toimprove water quality. Invasive plants will be removed and replaced with native trees, shrubs, and herbaceous vegetation. Additionally, the project requires a sanitary sewer force main bypass pumping system with flows up to 2,600 gallons per minute, requiring continuous 24-hour operation and maintenance while the bypass system is in service, as well as pre- and post-construction CCTV inspection of the sanitary sewer force main.