59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
NSN 7R-5975-015123483-V2, TDP VER 001, QTY 32 EA, DELIVERY FOB ORIGIN. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement Is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In acco rdance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: ## ____ days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted. This part requires engineering source approval by the design control activity in order to maintain …
Similar open contracts
62--CONTROL,ELECTRIC LI, IN REPAIR/MODIFICATION OF
NSN 7R-6220-013024410-SF, TDP VER 001, QTY 25 EA, DELIVERY FOB ORIGIN. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instan…
59--CIRCUIT BREAKER, IN REPAIR/MODIFICATION OF
NSN 7R-5925-015378655-KB, TDP VER 002, QTY 43 EA, DELIVERY FOB ORIGIN. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instan…
61--CONTROL,GENERATOR, IN REPAIR/MODIFICATION OF
NSN 7R-6110-014522467-KB, TDP VER 002, QTY 17 EA, DELIVERY FOB ORIGIN. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instan…
59--ANTENNA, IN REPAIR/MODIFICATION OF
NSN 7R-5985-015686919-E8, TDP VER 001, QTY 4 EA, DELIVERY FOB ORIGIN. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existi…
61--TRANSFORMER,POWER, IN REPAIR/MODIFICATION OF
NSN 7R-6120-014521359-KB, TDP VER 001, QTY 3 EA, DELIVERY FOB ORIGIN. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant…
16--APS PALLET, IN REPAIR/MODIFICATION OF
NSN 7R-1680-016338682-P8, TDP VER 001, QTY 17 EA, DELIVERY FOB ORIGIN. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Exist…