OPW 55252: 2027 Sidewalk Construction, Sidewalk Repairs, and Misc. ADA Curb Ramp Construction at Various Locations - City Wide
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications. SCOPE: Omaha Public Works is requesting to advertise OPW 55252 - 2027 Sidewalk Construction, Sidewalk Repairs, and Misc. ADA Curb Ramp Construction at Various Locations - City Wide project. This work shall consist of, but is not limited to, the necessary removal of existing curb, sidewalk, pavement and driveway, grading, forming, construction of combination curb and gutter, curb ramps, installation of the truncated domes, sidewalk, driveway, pavement, walls, and all necessary grading required to properly match the existing ground conditions. This work shall take place in various areas/locations within the City of Omaha. Anticipated Notice to Proceed date: Monday, 3/29/2027 This project does not have an SEB reserve. This project requires the submission of an Economic Sustainability Plan (ESP). This project qualifies for Apprentice utilization (optional). Contractor should attach Apprenticeship Incentive Form (AIF) with their bid submission to utilize this provision. Requirement for Bid Bond: The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury. Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable). LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID. The bid bond amount is listed in the Attributes section. A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section. The original document must be r…