Federal Contract

DOCK AND DECK PLATE REPAIR

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

VETERANS AFFAIRS, DEPARTMENT OF

NAICS Code

238990

Set-Aside

SDVOSBC

Department

VETERANS AFFAIRS, DEPARTMENT OF

Solicitation Type

Solicitation

Solicitation #

36C24626Q0889

PSC Code

Z1DA

Division

246-NETWORK CONTRACTING OFFICE 6 (36C246)

Performance State

VA

Posted

Mon, August 17, 2026

Response Deadline

Tue, September 8, 2026

Description

Department of Veterans Affairs Salem VA Medical Center 1970?Roanoke?Blvd,?Salem,?VA?24153 Statement of Work (SOW) Project Title:?Dock and Dock Plate Replacement � Buildings?14?&?15 Facility:?Salem?VA?Medical?Center (VAMC) Date:?May?14,?2026 1.?Scope?of?Work The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings?14?and?15, Salem?VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements. 2.?Description?of?Work Building?14 Remove existing dock plate. Sawcut and remove approximately 14?ft?�?50?ft?of?asphalt. Remove approximately 50?ft?of?existing curb. Excavate for new footing at existing dock wall to extend dock area. Form and pour new 4?ft?�?1?ft?�?14?ft?retaining wall with 4�4?steel angle on edge. Form and pour new 6?in?�?18?in?�?50?ft?curb. Form and pour new concrete drive (14?ft?�?50?ft?�?6?in), sloped to allow trucks to back up level with dock. Extend existing handrail by 2?ft. Install new 4?in?�?10?in?�?14?in?rubber dock bumpers. Building?15 Remove existing pit leveler and associated equipment. Infill existing pit with #57?gravel. Sawcut back of pit at cantilever. Pour new 4?in?concrete slab pinned to existing foundation. Install new 4?in?�?4?in?pit leveler frame and pour concrete perimeter. Install new 6?ft?�?8?ft?hydraulic pit leveler and 4?in?�?10?in?�?14?in?dock bumpers. 3.?Performance?Standards All work shall: Meet VA design and construction standards. Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines. Be executed following OSHA safety practices. Be completed per approved construction drawings and specifications. Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards. 4.?Schedule?and?Coordination Work schedule shall be coordinated with the VA Engineering Service prior to mobilization. Contractor sha

Similar open contracts